铝框木塑模板系统

铝框木塑模板系统是由一套模板和三套支撑组成的早拆模板体系。根据工程建施及结施图纸,经定型化设计工程所需的标准尺寸模板构件及与实际工程配套使用的非标准构件…
产品描述

铝框木塑模板系统

 

 
铝框木塑模板系统简介
铝框木塑模板系统是由一套模板和三套支撑组成的早拆模板体系。
根据工程建施及结施图纸,经定型化设计工程所需的标准尺寸模板构件及与实际工程配套使用的非标准构件。加固采用?#20013;?#26448;做背楞,支撑采用可调?#38477;?#25903;顶,模板之间利用销钉固定。
模板体系设计完成后,按设计图纸在工厂完成制作,模板质量需满足工程要求,之后对所有的模板构件分区、分单元分类作相应标记。然后打包转运到施工现场分类进行堆放。现场模板材料就位后,按模板规格编号“对号入座”分别安装。安装就位后,利用可调斜撑调整模板的垂直度、竖向可调支撑调整出差模板的水平标高;利用穿墙对拉螺杆及背楞保证模板体系的刚度及整体稳定性。模板安装验收通过后浇筑混凝土,在混凝土强度达到拆模规定的强度后,保留竖向支撑,按先后顺序对墙模板、梁侧模板及楼面模板进行拆除,?#26438;?#36827;入下一层的循环施工。
 
INTRODUCING WPC (WOOD PLASTIC COMPOSITE)ALUMINUM FRAME FORMWORK SYSTEM
WPC (wood plastic composite) aluminum formwork system technical that each floor only demands one of set panel and three set of supporting fittings.
Depend on the architecture and construction drawing required, design to standard size components and special components for matching the actual constructing. Formwork system use the metal profile structures waling to reinforce, Adjustable shoring prop scaffolding system, fasten by dowel between each formwork panel.
After design the Formwork system drawing completed, according to the design drawings in the factory to manufacturer the quality stander of formwork system to meet the project requirements. Each formwork panel cells &components will be marked partition, unit classification in accordingly. Then package and transport to the construction site, classification to pile up. After the formwork system materials in position, then according to the formwork panel marked number "reserved seats" to install. After the installation,Using adjustable shoring prop scaffolding can adjust vertical and elevation level of the formwork. Use wall threaded tie rod and waling to ensure the formwork system rigidity & stability. Formworks installed and acceptances, then to pour concrete, while the concrete strength enough, keep the vertical supports, then according to the order uninstall of wall, floor, and beam formwork panels, can quickly start to the next floor construction in cycle.
施工流程
Construction Process
 
为确保工程施工进度,模板工程施工顺序应遵循先做墙柱后做梁板的原则。
具体流程工艺如下:
  • 定位放线
    Measurement setting out
  • 墙柱水电施工
    Install water-electricity for wall and column
    墙柱梁板拆除
    Remove wall, column and beam panel
    墙柱?#32440;?#32465;扎
    Fix reinforcement for wall column
  • 钉墙柱定位筋
    Wall and column positioning
  • 安装墙柱模板
    Install wall and column formwork panel
  • 安装梁模板
    Install beam formwork panel
  • 安装楼面模板
    Install slab formwork panel
  • 梁板?#32440;?#32465;扎
    Fix reinforcement for beam slab
  • 梁板水电施工
    Install water-electricity for beam slab
    模板检查加固
    Check and firm Formwork panels
    楼面?#32440;?#32465;扎
    Fix reinforcement for slab
  • 检查及验收
    Inspection and acceptance
  • 混凝土浇筑
    Pouring concrete
 